Ion-science Hydrosteel 7000 User Manual Page 24

  • Download
  • Add to my manuals
  • Print
  • Page
    / 43
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 23
Hydrosteel 7000 MANUAL Ion Science Ltd
Page 24 of 43
Unrivalled Detection. www.ionscience.com
Commossioning
Commissioning is a matter of terminating the probe and electrical connections to the Hydrosteel 7000 unit
checking the installation and confirming correct operation. The commissioning consists of the following sub
sections:
Inspection of the equipment installation
Terminate probe connection to Hydrosteel 7000
Terminating power and 4-20 mA cables to Hydrosteel 7000
Start-up
Operation test
Hand over
Inspection of the equipment installation
The installation should be inspected prior to commissioning. The following is a check list of features for
inspection:
Probe (if accessible):
Clean test surface, without ridges such as welds
Secure fitting with the collector plate firmly pressed against the test surface
Protect the probe from ingress of water
Probe bracket to sample conduit:
Secure
Free of features that might present a danger to personnel
Sample tube:
Be fixed securely so that is safe from foreseeable damage
Hydrosteel 7000 mounting
Secure and accessible
Sample conduit and electrical connections accessible for connections.
Electrical cables
Continuity of cable cores has been tested
Insulation resistance between cores and between cores and screen has been tested
Connection of cables to correct services has been tested
In a hazardous area, the Power and 4-20 mA cables are labelled so that correct connections can
be made to the Hydrosteel
Page view 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 42 43

Comments to this Manuals

No comments